Sibmost OJSC opened the road interchange for traffic in Novosibirsk

Saturday, 07 December 2013

The construction of the elevated road was completed on the South Square (Yuzhnaya Ploshad) in Novosibirsk by Mostootryad No 38 specialists for Sibmost OJSC Novosibirsk Branch. The road traffic is now open in operating mode.

The construction of the traffic interchange on various levels on “Yuzhnaya” Square, as well as reconstruction works in Bolshevistskaya Street and in Berdskiy roadway to construct the Highway for constant driving are projected in the General Plan for Novosibirsk to be completed by 2030.

The principal interchange facility is the elevated road that links Krasniy prospect with Bolshevistskaya Street. The total length of the facility is 545.5 m. The normal cross-section of the elevated road ensures the passage for 6 traffic lanes (3 lanes for each destination) as well as operating corridor installation from both sides of 0.75 m in width. The construction customer is the Municipal Government Agency of Novosibirsk “Road Construction Department”. The cost of construction exceeds the amount of 2 350 mln rubles.

The term for in-service date is 2014. The road interchange involves pedestrian crossing (the length of the main passage is 55 m) over the Krasniy Prospekt.