MINISTER OF TRANSPORT OF THE RUSSIAN FEDERATION INSPECTED THE YENISEI RIVER BRIDGE CROSSING CONSTRUCTION IN KRASNOYARSK

Tuesday, 03 March 2015

most 2 15On February, 28 in the frame of Krasnoyarsk Economic Forum Minister of Transport Maxim SOKOLOV and Presidential Adviser Igor Levitin had a look at construction progress of the forth motorway bridge crossing across the Yenisei river in Krasnoyarsk. Minister of Transport of Krasnoyarsk Territory Sergey EREMIN and President of “Sibmost” JSC Albert KOSHKIN reported about the construction progress and vision.

moct 4 2 15 3Currently, over-water length of the bridge is being installed and substructions and trestleworks of right bank and left bank road junctions constructed at one of the country’s largest infrastructure facilities. During the inspection of the bridge crossing Albert Koshkin confirmed the compliance of the construction with the work schedule involving completion and commissioning of the facility in autumn 2015. The contract for the construction of the forth motorway bridge crossing across the Yenisei river in Krasnoyarsk was signed between “Sibmost” JSC and KRUDOR Krasnoyarsk Territory in June 2012. The cost of work is 12 billion rubles. Technical specifications of the future bridge crossing are as follows: total length is 6,7 km, length of the bridge - 1,3 km, 6 lanes, black top surface.

Sibmost JSC - a top-ranked national bridge construction enterprise, carrying out a complete set of roads and railways with man-made bridges, airports and other mixed engineering constructions construction works, it is multibusiness general contracting organization performing a complete set of works on roads and railways with engineering structures, other difficult engineering constructions and adjoining infrastructure development. For the next few years there are contracts concluded the amount of more than 60 bln. roubles.