COMPLETED PROJECTS

A FOURTH BRIDGE ACROSS THE YENISEI IN KRASNOYARSK

A FOURTH BRIDGE ACROSS THE YENISEI IN KRASNOYARSK

The fourth bridge across the Yenisei in Krasnoyarsk. The main bridge is 1.2 km with an orthotropic steel girder deck over the river, the total length of the object is about 7 km, with six lanes and two two-level interchange at the right and left banks of the Yenisei. The contract value - 12 billion rubles.

The bridge through the vostochnaya handyga river

The bridge through the vostochnaya handyga river

Construction of a bridge through the river Vostochnaya Handyga on a highway Eldikan-Handyga (highway Aldan), the Sakha Republic. Customer: “Corporation “Transstroi-Vostok” LLC. Contract sum - 657,777 million roubles. Construction time: 2009 – 2011.

Reconstruction of a highway M-52. Chuisky path

Reconstruction of a highway M-52. Chuisky path

Reconstruction of a highway M-52 “Chuisky path”, km 183 – km 20, the Altai Territory. Customer: “Altai” Federal state agency FHA. Contract sum - 1 996,175 777 million roubles. Construction time 2006 – 2013 (the object has been done ahead of time).

Northern bypass of Novosibirsk

Northern bypass of Novosibirsk

Construction of the second stage of the first turn of a highway Omsk-Novosibirsk (Northern bypass of Novosibirsk) on a site from village Prokudsky to the village Sokur with bridge transition through the Ob river near Krasny Yar village. Novosibirsk region. Customer: "Sibir" SI FHA. Contract sum - 5 952,550 million roubles. Construction time: 2009–2011.

Bridge through the Katun river

Bridge through the Katun river

Construction of a bridge through the Katun river near Aya village, the Altai Territory. Customer: “Road building administration №1“ OJSC . Contract sum - 352,752 million roubles. Construction time: 2009 – 2011.

Elizarovy street

Elizarovy street

Construction of the Elizarovy Street, Tomsk. Customer: Department of capital construction of Tomsk administration. Contract sum - 845,743 million roubles. Construction time: 2009 – 2011.

Bridge through the Tamma river

Bridge through the Tamma river

Construction of a bridge through the Tamma river on a railway line Berkakit – Tommot - Yakutsk, the Republic of Sakha (Yakutiya). Customer: “Corporation Transstroi-Vostok” LLC . Contract sum - 400 million roubles. Construction time: 2010-2011.

Overpass at a highway Vladivostok-Knevichi airport

Overpass at a highway Vladivostok-Knevichi airport

Construction of an overpass at a highway Vladivostok-Knevichi airport, Vladivostok. Subcontractor: “Bamstroimekhanizatsiya” OJSC. Contract sum - 372,26 million roubles. Construction time: 2010 – 2011.

Bridge through the Abakan river

Bridge through the Abakan river

Restoration of a bridge through the Abakan river, the Republic of Khakassia. Customer: “Transstroi“ Corporation . Contract sum – 160 million roubles. Construction time: 2011

Restoration of the Gorno-Altaisk Airoport

Restoration of the Gorno-Altaisk Airoport

Restoration of the Gorno-Altaisk airport, the Altai Territory. Customer: Federal state unitary enterprise “AGA (a)”. Contract sum - 329,82 (+96,7) million roubles. Construction time: 2010 – 2011.

Bratsky bridge

Bratsky bridge

Bratsky bridge through the Yenisei river at the Abakan Bypass is 352 meters length, 28 meters width.The Krasnoyarsk Territory

Bridge through the Tom river

Bridge through the Tom river

Bridge through the Tom’ river (the widest beyond the Urals, the bridge length is 638 meters, the width of a roadway is more than 40 meters), the Kemerovo and Tomsk Regions.

Bridge through the river Yenisei on a deep bypass of Krasnoyarsk

Bridge through the river Yenisei on a deep bypass of Krasnoyarsk

Bridge through the Yenisei river on a Deep Bypass of Krasnoyarsk, is 814,3 meters length, 23 meters - in width, the Krasnoyarsk Territory.

Oktyabrsky bridge. Novosibirsk

Oktyabrsky bridge. Novosibirsk

Oktyabrsky bridge. Novosibirsk. Handing in 1955.

Dmitrovsky bridge in Novosibirsk

Dmitrovsky bridge in Novosibirsk

Construction of a bridge started in 1971, on November 4, 1978 the bridge was opened. The bridge cost amounted to 20 million roubles (including accesses and interchanges — 53 million roubles). The length of a roadway— 701 m, the width — 30 m. The bridge has six traffic lines. Total length including accesses and interchanges — 5 km. The superelevation length — 631 m.

Metro bridge

Metro bridge

Metro brige (the only one behind the Urals, total length is 2145 km and river part is 896 meters). Novosibirsk. Comissioned in 1985.

The bridge across the Old Dniepr in Zaporozhye

The bridge across the Old Dniepr in Zaporozhye

The bridge across the Old Dniepr in Zaporozhye city (with the record ferroconcrete arch span 288 meters length). Ukraine. Comissioned in 1974

The bridge across the Norilskaya river

The bridge across the Norilskaya river

The bridge across the Norilskaya river for road-cum-rail traffic (the most nothern bridge among big bridges over the 69th parallel).

The first city bridge across the Yenisei river in Krasnodar city

The first city bridge across the Yenisei river in Krasnodar city

The first municipal bridge through the Yenisei river in Krasnoyarsk with unique technology of of ferroconcrete semi-arches in weight of 1560 tons installation and afloat archs junction in the span). It consists of two bridges, 940 and 410 meters length, separated with special dam via the Rest Island. The bridge’s width is 23,4 meters, height is 26 meters. Total length, with bridge crossing and approaches, is 2100 meters. Krasnoyars. Comissioned in 1961.

The second city bridge across the Yenisei river in Krasnodar city

The second city bridge across the Yenisei river in Krasnodar city

The second municipal bridge through the Yenisei river in Krasnoyarsk (the record beam span is 200,2 meters). Krasnoyarsk.

Cable-stayed footbridge

Cable-stayed footbridge

Cable-stayed footbridge – two pylons bridge of the composite structure across the Yenisei binnacle: armds and spans - ferroconcrete, aerial and structural elements (cables) — steel stranded ropes. The width — near 10 meters, length – 550 meters. Krasnoyarsk. Comissioned in 1985.


The bridge across the Novosibirsk HES undersluice

The bridge across the Novosibirsk HES undersluice

The bridge across the Novosibirsk HES undersluice. Novosibirsk. Comissioned in 2007.

Bridge across the Ob river

Bridge across the Ob river

Bridge across the Ob river, connecting Barnaul central districs and right bank of the river. Length - 940 m, consists of seven spans, width is 32m. Both-way three-lane traffic provides the capacity more than 20 thousand cars per day. Barnaul. Comissioned in 1997.

Bridge across the Chulym river

Bridge across the Chulym river

Bridge across the Chulym river. Total length is 713,08 m, width is 13,2 м. The bridge solved the problem of the Мост решил проблему year-round vehicle access of four districts of the Region. Tomsk Region. Comissioned in 2006.

Low-water bridge in Amursky Bay

Low-water bridge in Amursky Bay

Low-water Bridge between De-Friz peninsula and Sedanka. Bridge length is 5,33 km, its width is 24 m.